Contact Us
Export Sales:Sophie
TEL:+86-13961793184
E-mail:sales@handgroup.com.cn
After Sales:Summer
TEL:+86-17051326705
E-mail:service@handgroup.com.cn
Technology Support:Huiquan Yan
TEL: +86-18601477006
E-mail:china229@handgroup.com.cn
Address: No.321 Wuyun Road, Economic Development Zone, Wuxi City, Jiangsu Province, P.R.China
Suspended Scaffolding System Introduction Suspended Scaffolding System is high-efficiency modern speed assembling equipment capable of replacing traditional scaffold and being reused. Generally, the suspended scaffolding can be divided into two kinds: manual and electric. It is widely applied to...
Suspended Scaffolding System Introduction
Suspended Scaffolding System is high-efficiency modern speed assembling equipment capable of replacing traditional scaffold and being reused. Generally, the suspended scaffolding can be divided into two kinds: manual and electric. It is widely applied to the outer wall construction, curtain wall installation and outer wall cleaning and maintenance in high rise.
Technical parameters
ZLP1000 | ||||
NO. | Main Parts | Quantity | Remarks | |
1 | Working Platform | 1 set | L=(2.5m+2.5m+2.5m)=7.5M | |
2 | Safety Lock | 2pcs | LSD30 | |
3 | Suspension | Front beam overhang | 1set | 1.3-1.6m |
Adjustable Height of Beam | 1.3~1.7m | |||
4 | Hoist | 2sets | 220VThree Phase50HZ 2*1.8kw | |
5 | Electrical Control Box | 1set | ||
6 | Steel Wire Rope | 100m*4pcs | Diameter=8.3/9.1mm | |
7 | Electric Cable Wire | 100m*1pcs | ||
8 | Wheel Against Wall | 2pcs | Protect the glass curtain wall | |
9 | Caster Wheel | 4pcs | Move freely on the ground | |
10 | Heavy Hammer | 2pcs | Keep the platform vertical | |
11 | Reinforcing Rope | 8m*2pcs | Diameter=9.1mm | |
12 | Standard components | 1 plywood case | Match with the structural member |
Our Advantages
a. Extensive production experience: We are specialized in with Keywords an experience of 10 years.
b. Complete production facilities: Owning precision center less grinding machine, straightening machine, fine polishing machine, shearing machine, cutting machine, precision lathe, milling and drilling machine, hydraulic machine, punching machine and welding machine other advanced equipment. Our technicians will do regular scheduled maintenance on these machines to guarantee them work well.
c. High quality raw material: We mainly choose raw material from famous steel factory, such as BAO STEEL,TISCO STEEL,SHA STEEL, which are best and largest raw material manufacturer in China.
d. Strict Physical/operating testing procedures: Meeting the requirements of the product design and process, providing reliable testing data.
e. Short Delivery time: If one container 15 days. We also stock some standard-sized working platforms if you need 1-5days, we can delivery soon.
f. Safe packing: Small parts packed in small cartons and then poly wood pallet, Finally be packed with seaworthy package or in wooden case.
g. Best after-sale service: Over 90% products are sold to the Europe, South Africa, Southeast Asia, Middle East and Latin America and all products are trusted by domestic and foreign customers.
FAQ
Q:What’s your lead time of our Suspended Scaffolding System
---A: In general,15-20days against deposit. 7days for 1-5units.
Q: Features for Steel Suspended Scaffolding System with Plastic coating finish?
----Color Plastic Spraying on platform surface with competitive price compared with the aluminum alloy and hot dip galvanized surface.
----Hot dip galvanized steel platform with good Anti corrosion and Lower price than Aluminum alloy platform.
Q:Where the Suspended Scaffolding System production can be seem?
----50minutes by train from Shanghai, 2hours by plane from Guangzhou, 5hours by Train from Beijing.
Q: What should be know when buy Suspended Scaffolding System?
---A:capacity load, work height, hoist voltage, and working platform length, material(steel or aluminum), with counterweight or not.